翻訳と辞書
Words near each other
・ Nate Hawthorne
・ Nate Henry
・ Nate Hetherington
・ Nate Higgs
・ Nate Hill
・ Natchez National Cemetery
・ Natchez National Historical Park
・ Natchez On-Top-of-the-Hill Historic District
・ Natchez people
・ Natchez revolt
・ Natchez silt loam
・ Natchez State Park
・ Natchez Street Historic District
・ Natchez Trace
・ Natchez Trace Parkway
Natchez Trace Parkway Bridge
・ Natchez Trace Parkway Land Conveyance Act of 2013
・ Natchez Trace State Park
・ Natchez Trace Trail
・ Natchez, Alabama
・ Natchez, Indiana
・ Natchez, Louisiana
・ Natchez, Mississippi
・ Natchez-Adams School District
・ Natchez–Adams County Airport
・ Natchez–Vidalia Bridge
・ Natchiboura
・ Natchikpil
・ Natchitipi
・ Natchitoches


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Natchez Trace Parkway Bridge : ウィキペディア英語版
Natchez Trace Parkway Bridge

The Natchez Trace Parkway Bridge is a concrete double arch bridge located in Williamson County, Tennessee, from the northern terminus of the Natchez Trace Parkway. It is long and carries the two-lane Natchez Trace Parkway over State Route 96 and a heavily wooded valley. The long main span is symmetrical, while the long second arch is not, due to the slope of the valley at the southern end of the bridge.〔 The bridge is unique in that it does not use spandrel columns to support the deck from the arch. Rather than being evenly distributed along the arch's length, the weight of the bridge is concentrated at the crown of the arch. The lack of spandrel columns results in a clean, unencumbered appearance.
The bridge, also known as the Natchez Trace Parkway Arches, is the first segmentally constructed concrete arch bridge in the United States.〔 The arches comprise 122 hollow box segments precast in nearby Franklin, each of which was about long and weighed between .〔 The deck consists of 196 precast post-tensioned trapezoidal box girder segments, each typically long. The sections atop the crown of the arch are deep.〔 The foundations and piers of the bridge were cast in place.〔
The bridge was designed by Figg Engineering Group and built by PCL Civil Constructors Inc., a subsidiary of PCL Constructors Inc. The arches and deck were constructed using a balanced cantilever method. Each arch was supported by temporary cable stays anchored from the top of the piers and the valley sides until it was fully built.〔 This procedure was chosen in place of conventional shoring towers so that environmental damage to the valley would be minimized. The bridge cost US$11.3 million to build, and was completed in October 1993.〔 It was officially opened on March 22, 1994.
The bridge has won many awards for its design, including a Presidential Award for Design Excellence in 1995, and an Award of Merit from the Federal Highway Administration in 1996.〔(【引用サイトリンク】title=Excellence in Highway Design 1997 )〕 The Eleventh International Bridge Conference named it the single most outstanding achievement in the bridge industry for 1994. The bridge ''"impressed the... jury with its aesthetically striking double-arch design, which shows exceptional sensitivity to the historical context of the site."''
==References==



抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Natchez Trace Parkway Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.